P.C. Whitaker Contruction
Saturday, May 14, 2016
The single Waler system
We set up half the wall and poured it and then reused the formwork on the other half to save material cost.
8 in. Wall with a rebar mat 8 in. OC vertically and 10 in OC horizontally
No comments:
Post a Comment
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment